50GB
Mobile broadband
$40.00per 30 days, inc GST
- Data only
- 4G on the Optus network
- Alerts at 50%, 75%, 85% and 100% of your data
- Top up any time
- No lock‑in contract
Data only. It cannot make or receive calls or texts, including calls to 000.
Prepaid Uniden Mobile data on the Optus 4G network. No lock‑in contract.
Mobile broadband
$40.00per 30 days, inc GST
Data only. It cannot make or receive calls or texts, including calls to 000.
Need a different amount?
Per 30 days, inc GST. Data only, on 4G.
Identify what the router carries: periodic readings, remote maintenance sessions, images or a continuous connection to another system. Record the expected traffic and how the equipment behaves after losing service. This gives you a clearer basis for choosing an allowance than the router's maximum advertised speed.
Remote access may involve a VPN, a private network arrangement or a specific IP requirement. These features are not automatically included with a general mobile data plan. Carrier-grade address sharing can affect inbound access. Have your integrator confirm the required setup and obtain written service details before deployment.
Keep a record of the router, installed modem, firmware, SIM and APN configuration. For dual-SIM equipment, confirm whether the second slot provides failover, manual switching or another function. Two slots do not necessarily mean two connections operate simultaneously. Check any antenna, enclosure and power requirements with the equipment supplier.
Describe the equipment at each site and what it needs to reach. Include the router and modem variant, intended network technology, power source and the application carrying the traffic. Note whether access is initiated by the device or must be initiated from elsewhere. These details affect the service required.
Separate essential requirements from preferred features. A request for a static address, private APN or particular VPN behaviour should have a reason tied to the application. Give the specification to the system integrator and proposed connectivity provider so they can identify any mismatch before installation. A physical SIM that registers on a network has passed only one part of the process; the application still needs a supported path to its destination.
Periodic readings can produce a small regular workload while software updates or remote maintenance create occasional larger transfers. Include both in the estimate. Ask how often the application retries when communication fails and whether queued information is sent when the connection returns.
Run a pilot using the intended reporting settings and review the service records against the router's own counters. They may not measure traffic in precisely the same way, so understand which record controls billing. Document the assumptions used to select the allowance. Revisit them when devices, firmware or reporting requirements change. An allowance that suited a single sensor gateway may no longer fit after additional equipment is connected behind the same router.
Identify who is responsible for the SIM account, router configuration, application endpoint and installation. Keep an asset register with the site, device and service identifiers. Record approved settings without placing passwords or access keys into broadly shared documents.
Use the equipment's supported access controls and the organisation's security practices. If external support is required, agree the access method with the responsible IT team. When equipment is retired or moved, review both access and billing. A router may remain reachable after it stops serving its original purpose, while a cancelled SIM can affect other devices using the same connection. Treat decommissioning and relocation as planned changes rather than simply removing a box from the site.
Consider what the application should do if coverage drops, power is interrupted or an allowance is exhausted. The correct response depends on the system. Some installations can tolerate delayed reports; others need a defined alternative process. Agree those requirements with the operator before deployment.
Where a router has two SIM slots, test the actual switching setup and document any limitations. Check how the application reconnects and whether remote access remains possible through the alternative service. Include return to the preferred connection in the test. A second SIM is useful only when the hardware, settings and services work together as intended. It should not be represented as a guarantee against every network or equipment failure.
A gateway sending readings and supporting occasional maintenance needs an allowance for both activities. Ask the integrator to identify normal reporting traffic and the larger transfers expected during updates. Test the required server access before deployment, then retain the approved configuration with the asset record. The resulting specification is more useful than selecting a SIM solely from the gateway's maximum connection speed.
Sometimes, but the plan terms and application requirements must allow it. Remote access, unattended deployment and support needs may call for a different service.
Only where expressly specified. Ask for the required addressing, VPN or private-network arrangement rather than assuming it is standard.
Compatible equipment may support this with suitable services and configuration. Check its switching behaviour and the network underlying each SIM.
No. Cellular modules and supported bands can vary. Confirm the exact model or order code intended for the Australian deployment.
No. Registration is one stage. Check the router's data session, required network settings and the application's actual communication with its endpoint. Confirm a normal transaction or report through the complete system.
Provide the exact hardware variant, installation locations, radio technology, estimated traffic, remote-access method and any required addressing or private-network features. Include the responsible integrator where the application needs a specialised setup.
It may, where the router and local network support that design. Include the combined traffic, access controls and application requirements when assessing the mobile service rather than treating each machine's workload separately.